NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Interstage Flammability Analysis ApproachThe Interstage of the Ares I launch platform houses several key components which are on standby during First Stage operation: the Reaction Control System (ReCS), the Upper Stage (US) Thrust Vector Control (TVC) and the J-2X with the Main Propulsion System (MPS) propellant feed system. Therefore potentially dangerous leaks of propellants could develop. The Interstage leaks analysis addresses the concerns of localized mixing of hydrogen and oxygen gases to produce deflagration zones in the Interstage of the Ares I launch vehicle during First Stage operation. This report details the approach taken to accomplish the analysis. Specified leakage profiles and actual flammability results are not presented due to proprietary and security restrictions. The interior volume formed by the Interstage walls, bounding interfaces with the Upper and First Stages, and surrounding the J2-X engine was modeled using Loci-CHEM to assess the potential for flammable gas mixtures to develop during First Stage operations. The transient analysis included a derived flammability indicator based on mixture ratios to maintain achievable simulation times. Validation of results was based on a comparison to Interstage pressure profiles outlined in prior NASA studies. The approach proved useful in the bounding of flammability risk in supporting program hazard reviews.
Document ID
20120002833
Acquisition Source
Marshall Space Flight Center
Document Type
Abstract
Authors
Little, Jeffrey K.
(Jacobs Technologies Engineering Science Contract Group Huntsville, AL, United States)
Eppard, William M.
(Gray Research, Inc. Huntsville, AL, United States)
Date Acquired
August 25, 2013
Publication Date
December 5, 2011
Subject Category
Launch Vehicles And Launch Operations
Report/Patent Number
M11-0743
Report Number: M11-0743
Meeting Information
Meeting: JANNAF 5th Spacecraft Propulsion Subcommittee Meeting
Location: Huntsville, AL
Country: United States
Start Date: December 5, 2011
End Date: December 9, 2011
Sponsors: NASA Headquarters, Department of the Army, Department of the Navy, Department of the Air Force
Funding Number(s)
CONTRACT_GRANT: NNM05AB50C
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available