Test Analysis Correlation of the Single Stringer Bending Tests for the Space Shuttle ET-137 Intertank Stringer Crack InvestigationOn November 5, 2010, Space Shuttle mission STS-133 was scrubbed due to a hydrogen leak at the Ground Umbilical Carrier Plate (GUCP). After the scrub, a crack in the foam thermal protection system (TPS) was observed on the External Tank (ET) near the interface between the liquid oxygen (LOX) tank and the Intertank. When the damaged foam was removed, two 9-in. long cracks were found on the feet of Intertank stringer S7-2, and the stringer failure was the cause of the TPS crack. An investigation was conducted to determine the root cause of the cracks, establish a remedy/repair for the stringers, and provide flight rationale for the damaged tank, ET-137. The Space Transportation System (STS) Super Lightweight ET (SLWT) is comprised of two propellant tanks (an aft liquid hydrogen (LH2) tank and a forward LOX tank) and an Intertank. The Intertank serves as the structural connection between the two propellant tanks and also functions to receive and distribute all thrust loads from the solid rocket boosters . The Intertank is a stiffened cylinder structure consisting of eight mechanically joined panels (two integrally-stiffened, machined thrust panels to react the booster loads and six stringer-stiffened skin panels). There are one main ring frame, four intermediate ring frames, and forward and aft flange chords that mate to the respective propellant tanks.. The skin/stringer panels utilize external hat-section stringers that are mechanically attached with rivets along most of their length and with specialty fasteners, such as GP Lockbolts and Hi-Loks, at the forward and aft ends where the stringers attach to the flange chords. During the STS-133 Intertank stringer crack investigation, cracks were found on a total of five stringers. All of the cracks were at the LOX end, in the feet of the stringers, and near the forward fasteners (GP Lockbolts). Video of tanking for the November 5 launch attempt was used to determine that the TPS failure, and thus the stringer failure, occurred as the LOX liquid level crossed the LOX tank / Intertank interface ring frame. Hence, cryogenically-induced displacements were suspected as a contributing cause of the stringer cracks. To study the behavior of Intertank stringers subjected to similar displacements, static load tests of individual stringers, colloquially known as "single stringer bending tests" were performed. Approximately thirty stringers were tested, many of which were cut from the partially completed Intertank for what would have been ET-139. In addition to the tests, finite element (FE) analyses of the test configuration were also performed. In this paper, the FE analyses and test-analysis correlation for stringer test S6-8 are presented. Stringer S6-8 is a "short chord" configuration with no doubler panels.
Document ID
20120014455
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Phillips, Dawn R.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Saxon, Joseph B.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Wingate, Robert J.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
August 26, 2013
Publication Date
April 23, 2012
Subject Category
Spacecraft Propulsion And Power
Report/Patent Number
M11-0921
M12-1716
M12-1612
Report Number: M11-0921
Report Number: M12-1716
Report Number: M12-1612
Meeting Information
Meeting: 13th AIAA Gossamer Systems Forum
Location: Honolulu, HI
Country: United States
Start Date: April 23, 2012
End Date: April 26, 2012
Sponsors: American Helicopter Society, Inc., American Inst. of Aeronautics and Astronautics, American Society of Mechanical Engineers
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available