NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Integration Testing of Space Flight SystemsThis paper discusses the benefits of conducting multi-system integration testing of space flight elements in lieu of merely shipping and shooting to the launch site and launching. "Ship and shoot" is a philosophy that proposes to transport flight elements directly from the factory to the launch site and begin the mission without further testing. Integration testing, relevant to validation testing in this context, is a risk mitigation effort that builds upon the individual element and system levels of qualification and acceptance tests, greatly improving the confidence of operations in space. The International Space Station Program (ISSP) experience is the focus of most discussions from a historical perspective, while proposed integration testing of the Constellation Program is also discussed. The latter will include Multi-Element Integration Testing (MElT) and Flight Element Integration Testing (FElT).
Document ID
20130009982
Acquisition Source
Kennedy Space Center
Document Type
Conference Paper
Authors
Sowards, Stephanie
(NASA Kennedy Space Center Cocoa Beach, FL, United States)
Honeycutt, Timothy
(NASA Kennedy Space Center Cocoa Beach, FL, United States)
Date Acquired
August 27, 2013
Publication Date
April 8, 2008
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
KSC-2008-014
Report Number: KSC-2008-014
Meeting Information
Meeting: Integration Testing of Space Flight Systems
Location: Manhattan Beach, CA
Start Date: April 8, 2008
End Date: April 10, 2008
Sponsors: Aerospace Corp.
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available