NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Installation of TVC Actuators in a Two Axis Inertial Load Simulator Test StandThis paper is about the installation of Space Shuttle Main Engines (SSME) actuators in the new Two Axis Inertial Load Simulator (ILS) at MSFC. The new test stand will support the core stage of the Space Launch System (SLS). Because of the unique geometry of the new test stand standard actuator installation procedures will not work. I have been asked to develop a design on how to install the actuators into the new test stand. After speaking with the engineers and technicians I have created a possible design solution. Using Pro Engineer design software and running my own stress calculations I have proven my design is feasible. I have learned how to calculate the stresses my design will see from this task. From the calculations I have learned I have over built the apparatus. I have also expanded my knowledge of Pro Engineer and was able to create a model of my idea.
Document ID
20130013874
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Dziubanek, Adam
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
August 27, 2013
Publication Date
April 8, 2013
Subject Category
Spacecraft Propulsion And Power
Report/Patent Number
M13-2513
Meeting Information
Meeting: AIAA Region II Student Conference
Location: Raleigh, NC
Country: United States
Start Date: April 8, 2013
End Date: April 9, 2013
Sponsors: American Inst. of Aeronautics and Astronautics
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available