An Example of Risk Informed DesignNASA Engineering requested a Probabilistic Risk Assessment (PRA) to compare the difference in the risk of Loss of Crew (LOC) and Loss of Mission (LOM) between different designs of a fluid assembly. They were concerned that the configuration favored by the design team was more susceptible to leakage than a second proposed design, but realized that a quantitative analysis to compare the risks between the two designs might strengthen their argument. The analysis showed that while the second design did help improve the probability of LOC, it did not help from a probability of LOM perspective. This drove the analysis team to propose a minor design change that would drive the probability of LOM down considerably. The analysis also demonstrated that there was another major risk driver that was not immediately obvious from a typical engineering study of the design and was therefore unexpected. None of the proposed alternatives were addressing this risk. This type of trade study demonstrates the importance of performing a PRA in order to completely understand a system's design. It allows managers to use risk as another one of the commodities (e.g., mass, cost, schedule, fault tolerance) that can be traded early in the design of a new system.
Document ID
20140003784
Acquisition Source
Johnson Space Center
Document Type
Abstract
Authors
Banke, Rick (Science Applications International Corp. Houston, TX, United States)
Grant, Warren (NASA Johnson Space Center Houston, TX, United States)
Wilson, Paul (Science Applications International Corp. Houston, TX, United States)
Date Acquired
April 25, 2014
Publication Date
January 1, 2014
Subject Category
Spacecraft Design, Testing And PerformanceStatistics And Probability
Report/Patent Number
JSC-CN-30947Report Number: JSC-CN-30947
Meeting Information
Meeting: Technical Symposium
Location: Houston, TX
Country: United States
Start Date: May 9, 2014
Sponsors: American Inst. of Aeronautics and Astronautics