NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Using Generic Data to Establish Dormancy Failure RatesMany hardware items are dormant prior to being operated. The dormant period might be especially long, for example during missions to the moon or Mars. In missions with long dormant periods the risk incurred during dormancy can exceed the active risk contribution. Probabilistic Risk Assessments (PRAs) need to account for the dormant risk contribution as well as the active contribution. A typical method for calculating a dormant failure rate is to multiply the active failure rate by a constant, the dormancy factor. For example, some practitioners use a heuristic and divide the active failure rate by 30 to obtain an estimate of the dormant failure rate. To obtain a more empirical estimate of the dormancy factor, this paper uses the recently updated database NPRD-2011 [1] to arrive at a set of distributions for the dormancy factor. The resulting dormancy factor distributions are significantly different depending on whether the item is electrical, mechanical, or electro-mechanical. Additionally, this paper will show that using a heuristic constant fails to capture the uncertainty of the possible dormancy factors.
Document ID
20140006573
Acquisition Source
Johnson Space Center
Document Type
Conference Paper
Authors
Reistle, Bruce
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
June 3, 2014
Publication Date
January 1, 2014
Subject Category
Quality Assurance And Reliability
Electronics And Electrical Engineering
Report/Patent Number
JSC-CN-30414
Report Number: JSC-CN-30414
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available