NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to ManufacturingThe Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.
Document ID
20140010449
Acquisition Source
Marshall Space Flight Center
Document Type
Abstract
Authors
Birkenstock, Benjamin
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Kauer, Roy
(Boeing Co. Huntsville, AL, United States)
Date Acquired
August 5, 2014
Publication Date
May 19, 2014
Subject Category
Ground Support Systems And Facilities (Space)
Report/Patent Number
M13-3164
Report Number: M13-3164
Meeting Information
Meeting: Space Symposium
Location: Colorado Springs, CO
Country: United States
Start Date: May 19, 2014
End Date: May 22, 2014
Sponsors: Space Foundation
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available