NASA's Space Launch System Development StatusDevelopment of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.
Document ID
20140010977
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Lyles, Garry
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
August 25, 2014
Publication Date
May 19, 2014
Subject Category
Space Transportation And Safety
Launch Vehicles And Launch Operations
Report/Patent Number
M14-3555
Report Number: M14-3555
Meeting Information
Meeting: Space Propulsion 2014
Location: Cologne
Country: Germany
Start Date: May 19, 2014
End Date: May 22, 2014
Sponsors: 3AF - Association of Aeronautics and Astronautics, Deutsche Forschungsanstalt fuer Luft- und Raumfahrt, European Space Agency, Centre National d'Etudes Spatiales
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available