NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
JWST Pathfinder Telescope IntegrationThe James Webb Space Telescope (JWST) is a 6.5m, segmented, IR telescope that will explore the first light of the universe after the big bang. In 2014, a major risk reduction effort related to the Alignment, Integration, and Test (AI&T) of the segmented telescope was completed. The Pathfinder telescope includes two Primary Mirror Segment Assemblies (PMSA's) and the Secondary Mirror Assembly (SMA) onto a flight-like composite telescope backplane. This pathfinder allowed the JWST team to assess the alignment process and to better understand the various error sources that need to be accommodated in the flight build. The successful completion of the Pathfinder Telescope provides a final integration roadmap for the flight operations that will start in August 2015.
Document ID
20150015949
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Matthews, Gary W.
(Exelis, Inc. McLean, VA, United States)
Kennard, Scott H.
(Exelis, Inc. McLean, VA, United States)
Broccolo, Ronald T.
(Exelis, Inc. McLean, VA, United States)
Ellis, James M.
(Exelis, Inc. McLean, VA, United States)
Daly, Elizabeth A.
(Exelis, Inc. McLean, VA, United States)
Hahn, Walter G.
(Exelis, Inc. McLean, VA, United States)
Amon, John N.
(Exelis, Inc. McLean, VA, United States)
Mt. Pleasant, Stephen M.
(Exelis, Inc. McLean, VA, United States)
Texter, Scott
(Northrop Grumman Aerospace Systems Redondo Beach, CA, United States)
Atkinson, Charles B.
(Northrop Grumman Aerospace Systems Redondo Beach, CA, United States)
McKay, Andrew
(Northrop Grumman Aerospace Systems Redondo Beach, CA, United States)
Levi, Joshua
(Northrop Grumman Aerospace Systems Redondo Beach, CA, United States)
Keski-Kuha, Ritva
(NASA Goddard Space Flight Center Greenbelt, MD United States)
Feinberg, Lee
(NASA Goddard Space Flight Center Greenbelt, MD United States)
Date Acquired
August 13, 2015
Publication Date
August 9, 2015
Subject Category
Optics
Report/Patent Number
GSFC-E-DAA-TN25124
Meeting Information
Meeting: SPIE Optical Engineering + Applications Conference
Location: San Diego, CA
Country: United States
Start Date: August 9, 2015
End Date: August 13, 2015
Sponsors: International Society for Optical Engineering
Funding Number(s)
CONTRACT_GRANT: NAS5-02200
CONTRACT_GRANT: NNG11FD64C
Distribution Limits
Public
Copyright
Public Use Permitted.
Keywords
JWST
Test
Integration
Telescope
Alignment
No Preview Available