Land Use Control Implementation PlanThis Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.
Document ID
20160000964
Acquisition Source
Kennedy Space Center
Document Type
Other
Authors
Starr, Andrew Scott (Arcadis US, Inc. Tampa, FL, United States)