NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Icebreaker-3 Drill Integration and Testing at Two Mars-Analog SitesA decade of evolutionary development of integrated automated drilling and sample handling at analog sites and in test chambers has made it possible to go 1 meter through hard rocks and ice layers on Mars. The latest Icebreaker-3 drill has been field tested in 2014 at the Haughton Crater Marsanalog site in the Arctic and in 2015 with a Mars lander mockup in Rio Tinto, Spain, (with sample transfer arm and with a prototype life-detection instrument). Tests in Rio Tinto in 2015 successfully demonstrated that the drill sample (cuttings) was handed-off from the drill to the sample transfer arm and thence to the on-deck instrument inlet where it was taken in and analyzed ("dirt-to-data").
Document ID
20160006480
Acquisition Source
Ames Research Center
Document Type
Conference Paper
Authors
Glass, B.
(NASA Ames Research Center Moffett Field, CA United States)
Bergman, D.
(Universities Space Research Association Moffett Field, CA, United States)
Yaggi, B.
(Honeybee Robotics Pasadena, CA, United States)
Dave, A.
(Wyle Labs., Inc. Moffett Field, CA, United States)
Zacny, K.
(Honeybee Robotics Pasadena, CA, United States)
Date Acquired
May 20, 2016
Publication Date
April 11, 2016
Subject Category
Lunar And Planetary Science And Exploration
Report/Patent Number
ARC-E-DAA-TN29639
Report Number: ARC-E-DAA-TN29639
Meeting Information
Meeting: ASCE Earth and Space Conference
Location: Orlando, FL
Country: United States
Start Date: April 11, 2016
End Date: April 15, 2016
Sponsors: American Society of Civil Engineers, Missouri Univ. of Science and Technology
Funding Number(s)
CONTRACT_GRANT: NNH15CO48B
WBS: WBS 811073
CONTRACT_GRANT: NNA14AB82C
Distribution Limits
Public
Copyright
Public Use Permitted.
Keywords
astrobiology
analog sites
subsurface
No Preview Available