NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Leadership Development Program Final ProjectTOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.
Document ID
20160011524
Acquisition Source
Kennedy Space Center
Document Type
Presentation
Authors
Parrish, Teresa C.
(Jacobs Technology Inc. Tullahoma, TN, United States)
Date Acquired
September 27, 2016
Publication Date
September 3, 2016
Subject Category
Spacecraft Design, Testing And Performance
Administration And Management
Report/Patent Number
KSC-E-DAA-TN35935
Report Number: KSC-E-DAA-TN35935
Meeting Information
Meeting: Leadership Developement Program
Location: Titusville, Fl
Country: United States
Start Date: September 23, 2016
Sponsors: Jacobs Technology Inc.
Funding Number(s)
CONTRACT_GRANT: NNK13MA14C
Distribution Limits
Public
Copyright
Public Use Permitted.
Keywords
Design products required for Engineering
No Preview Available