NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Proposal to Accomplish Phase B Space Shuttle ProgramThis proposal has been prepared in response to National Aeronautics and Space Administration Request for Proposal No. 10-8423, dated February 20, 1970, and Amendments No.1, 2, 3, & 4 thereto. It is firm for a period of not less than one hundred twenty (120) days from March 30, 1970. The executed certifications requested in Enclosures 5 and 6 of the Request for Proposal are appended at the end of this proposal. Grumman Aerospace Corporation, along with its associates -- the General Electric Company, Eastern Airlines, the Northrop Corporation, and the Aerojet-General Corporation -- are pleased to submit this proposal. This study must prove that technical challenges can be met at a cost commensurate with realistic national funding levels at an early date, (perferably prior to the late 1977 initial operating capability (IOC) indicated in the Statement of Work). We have assembled a team of extremely competent associates. Together, we are fully qualified to study all facets of the proposed Phase B study, and to develop and build the product. We believe we have already made a promising start toward defining the concept of the space shuttle system.
Document ID
20160012503
Acquisition Source
Headquarters
Document Type
Other
Authors
Mead, Lawrence M.
(Grumman Aerospace Corp. Bethpage, NY, United States)
Gavin, Joseph G., Jr.
(Grumman Aerospace Corp. Bethpage, NY, United States)
Date Acquired
October 21, 2016
Publication Date
March 30, 1970
Subject Category
Launch Vehicles And Launch Operations
Report/Patent Number
70-35NAS
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available