NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Section I SummaryShuttle Flight 41-C, the Solar Max Repair mission, took off on April 6, 1984 from Kennedy Space Center in Florida. As with 41-B, the dress rehearsal for this flight, launch was early in the morning. It occurred at 7:58 CST. The landing also took place at KSC the following Friday, April 13, 1984. This was Challenger's fifth flight. There were two prime EMU's and one back-up short EMU stowed for this flight in the Airlock. The two MMU's were again mounted in their Flight Support Stations in the payload bay. Figure 1 shows the EMU functional schematic while Figure 2 shows the hardware which makes up the EMU. The payload bay configuration for the MMU's appears in Figure 3.
Document ID
20160013669
Acquisition Source
Johnson Space Center
Document Type
Other
Date Acquired
November 22, 2016
Publication Date
January 1, 2016
Subject Category
Space Transportation And Safety
Lunar And Planetary Science And Exploration
Report/Patent Number
JSC-CN-36746
Report Number: JSC-CN-36746
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available