NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Space Probes Program Status ReportBrief of Progress: A. Preparations for the 26 November launching of ABLE-4 ATLAS are proceeding as scheduled, with no problems apparent at this time. Many of the electrical tests and subsystems checks have been completed. Minor modifications have been made to the solar paddle tie-down and release mechanism, after an extensive testing program; B. Work toward the 10 December launching of ABLE-4 THOR is also progressing on schedule. Subsystem checks have been started, and mechanical fit checks have been completed; C. During the month of October, a total of 136 tests were performed on components and assemblies related to the ABLE program. These included acceptance tests, type tests, R&D tests, etc. Of this total, only three failures occurred, all of which have been corrected; D. The Space Physics Data Library, Los Angeles, California, is now in operation. Data reduction gear in the Library is in breadboard operation with completion of the installation expected by mid-November. Analysis of ABLE-3 data is progressing satisfactorily at the Library.
Document ID
20170000904
Acquisition Source
Legacy CDMS
Document Type
Contractor or Grantee Report
Date Acquired
January 27, 2017
Publication Date
November 10, 1959
Subject Category
Launch Vehicles And Launch Operations
Report/Patent Number
WDPCR-109
Report Number: WDPCR-109
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available