Modeling and Simulation of an Integrated Gate Turnaround Management ConceptAn Integrated Gate Turnaround Management (IGTM) prototype was developed at NASA Ames Simulation Laboratories (SimLabs) using Dallas Ft. Worth International Airport (DFW) to demonstrate the IGTM concepts feasibility and benefits. The simulation architecture includes: the IGTM controller, an Airline Operations Control (AOC) application, Big DataAnalytics Input (BAI) application, a terminal traffic simulation or known as NASA-developed Surface Operation Simulator and Scheduler (SOSS), and a Database Server. ActiveMQ, a Java messaging service, was used to emulate the System Wide Information Management (SWIM) data network messaging. This paper describes the modeling and simulation of the IGTM concept, and illustrates selected use cases to demonstrate the feasibility and benefits of the IGTM concept for optimizing gate turnaround operations.
Document ID
20190001114
Acquisition Source
Ames Research Center
Document Type
Conference Paper
Authors
Chung, William W.
(Science Applications International Corp. Moffett Field, CA, United States)
Ahlquist, Douglas Kurt
(Science Applications International Corp. Moffett Field, CA, United States)
Ingram, Carla D.
(Science Applications International Corp. Moffett Field, CA, United States)
Chachad, Girish H.
(Science Applications International Corp. Moffett Field, CA, United States)
Monheim, Spencer C.
(Science Applications International Corp. Moffett Field, CA, United States)
Date Acquired
March 4, 2019
Publication Date
April 26, 2016
Subject Category
Air Transportation And Safety
Report/Patent Number
ARC-E-DAA-TN29867
Report Number: ARC-E-DAA-TN29867
Meeting Information
Meeting: MODSIM World 2016
Location: Virginia Beach, VA
Country: United States
Start Date: April 26, 2016
End Date: April 28, 2016
Sponsors: Science Applications International Corp.
Funding Number(s)
WBS: WBS 330693.04.20.01.02
CONTRACT_GRANT: NNA13AA07C
Distribution Limits
Public
Copyright
Public Use Permitted.
Keywords
gate turnaround management
No Preview Available