Continuously Improving Parametric Modeling with Historical Data on the ICESat-2 MissionThis paper delves into the details of the Joint Confidence Level (JCL) process performed for the Ice, Cloud, and Land Elevation Satellite (ICESat)-2 mission and how past performance was incorporated into subsequent JCL models to enable the project to continuously analyze potential slips to their launch readiness date (LRD). One year prior to the mission Preliminary Review (mPDR), the JCL model development process began. The first model was well received at the mPDR, held on October 10, 2012, and the input received by the Standing Review Board was incorporated into the model for the official data drop for key decision point (KDP)-C. The 70% JCL results of the October 2012 mPDR model forecast an LRD of February 2017 and associated cost of $830M. This result in 2012 immediately highlighted potential challenges with the project-planned LRD of July 2016. The year following the mPDR, the project had sustained a oneyear slip in the LRD due to problematic systems engineering requirement issues which impacted all project subsystems. This slip moved the project planned LRD from July 2016 to July 2017, an additional 5 months beyond the 2012 model’s 70% JCL result for the LRD of February 2017. As the project was quickly approaching the mission Critical Design Review (mCDR), the need for reliable JCL results increased significantly. The project held discussions on the JCL modeling process and focused on the input uncertainty distributions. Specifically, to identify the uncertainty distributions that the 2012 mPDR model would have needed to produce a 70% LRD result of July 2017. This led the project to compare multiple uncertainty distributions, and ultimately spurred the project to utilize uncertainty distributions that incorporated project past performance and historical data to forecast potential LRD slips. The revised results, created in 2014 and utilizing the new uncertainty distributions, showed that with 70% confidence, the ICESat-2 mission would launch in August 2018 with a cost of $1,044M. Today, ICESat-2 is scheduled to launch on September 15, 2018 with a project management (PM) agreement value of $1,056M. This illustrates how a JCL model can be continuously improved to produce valuable results for a project, even in cases of LRD delays. The primary reason for the ICESat-2 LRD delay is due to a laser failure on the primary instrument. Laser failure was one of the highest risk and uncertainty drivers within the JCL model. The project placed the most risk in this area of the model, and the model further identified the laser as the top risk driver and contributor to the LRD result. This further illustrates how a JCL can be used to predict and quantify possible issues on new technology missions.
Document ID
20190001436
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Krygiel, Joseph
(InuTeq, LLC Beltsville, MD, United States)
Date Acquired
March 12, 2019
Publication Date
March 2, 2019
Subject Category
Earth Resources And Remote Sensing
Administration And Management
Report/Patent Number
GSFC-E-DAA-TN65784
Meeting Information
Meeting: International Conference for Aerospace Experts, Academics, Military Personnel, and Industry Leaders
Location: Big Sky, MT
Country: United States
Start Date: March 2, 2019
End Date: March 9, 2019
Sponsors: Institute of Electrical and Electronics Engineers
Funding Number(s)
CONTRACT_GRANT: NNG15VN01C
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available