NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Understanding Community Needs and DesiresThis panel exchange is focused on the Integration Test phase within the development lifecycle with special emphasis and dedicated discussion on integration and testing of complex systems. Layout and scheduling of integration tasks come from the verification of interface and performance requirements. However, planning for integration activities of complex systems is inherently different from traditional systems engineering integration planning activities. Decisions about the systems under development have to consider not only the technical and programmatic viewpoints but also the political, societal, operational, and economic viewpoints. Definition of performance measures, found intrinsic in the plan, with trans-disciplinary implications will be discussed. A scenario of integration of UAS in the NAS will be used as a benchmark of current views and lifecycle challenges.
Document ID
20190025347
Acquisition Source
Ames Research Center
Document Type
Presentation
Authors
Murphy, James R.
(NASA Ames Research Center Moffett Field, CA, United States)
Date Acquired
May 24, 2019
Publication Date
June 22, 2015
Subject Category
Air Transportation And Safety
Report/Patent Number
ARC-E-DAA-TN24298
Report Number: ARC-E-DAA-TN24298
Meeting Information
Meeting: AIAA AVIATION Forum
Location: Dallas Texas
Country: United States
Start Date: June 22, 2015
End Date: June 26, 2015
Sponsors: American Institute of Aeronautics and Astronautics (AIAA)
Funding Number(s)
WBS: 357672.05.01.01.01
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available