NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
L2 Station Keeping Maneuver Strategy for the James Webb Space TelescopeThe station-keeping plan for the James Webb Space Telescope is zero velocity in the x-component at the fourth successive crossing of the XZ plane of the rotation libration point frame. A differential corrector is employed to determine the necessary delta-v. Maneuvering along the position component of the stable eigenvector of the monodromy matrix produces a minimum delta-v solution. The techniques developed to determine the minimum maneuver direction in a full ephemeris model, along with strategies to cope with the attitude constraints imposed by the sunshield that prevents the ability to maneuver along the stable eigenvector, are examined in this study.
Document ID
20190028877
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Petersen, Jeremy
(A.I. Solutions)
Date Acquired
August 9, 2019
Publication Date
August 11, 2019
Subject Category
Astrodynamics
Report/Patent Number
GSFC-E-DAA-TN71319
Report Number: GSFC-E-DAA-TN71319
Meeting Information
Meeting: 2019 AAS/AIAA Astrodynamics Specialist Conference
Location: Portland, ME
Country: United States
Start Date: August 11, 2019
End Date: August 15, 2019
Sponsors: American Astronautical Society (AAS-HQ)
Funding Number(s)
CONTRACT_GRANT: NNG14VC09C
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Single Expert
Keywords
Libration Point Orbit
No Preview Available