NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
The New NASA Approach to Reliability and MaintainabilityIn 2017, after 20 years, NASA issued a major revision of its reliability and maintainability (R&M) policy, NASA-STD- 8729.1A. Formerly NASA required certain specific R&M activities during each succeeding phase of project development. Now NASA requires a project to start by including the initial development of R&M requirements and the devising of strategies to implement and verify them. Rather than resolving all the requirements first and then designing the system, as has been usual in systems design, the design process now is to work top down by layers. It begins by first identifying the top level requirements and suggesting top level design strategies for those, then making these higher strategies the basis for a lower level set of requirements, and so on down to the lowest components. This approach is intended to ensure that R&M is designed in from the beginning rather than added later with difficulty to a completed design concept. The new R&M standard uses an innovative and effective top-down system design approach intended to effectively implement R&M.
Document ID
20200000609
Acquisition Source
Ames Research Center
Document Type
Conference Paper
Authors
Jones, Harry W.
(NASA Ames Research Center Moffett Field, CA, United States)
Date Acquired
January 30, 2020
Publication Date
January 27, 2020
Subject Category
Systems Analysis And Operations Research
Report/Patent Number
ARC-E-DAA-TN75561-1
Report Number: ARC-E-DAA-TN75561-1
Meeting Information
Meeting: RAM Annual Reliability & Maintainability
Location: Palm Springs, CA
Country: United States
Start Date: January 27, 2020
End Date: January 30, 2020
Sponsors: Institute of Electrical and Electronics Engineers (IEEE)
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available