NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Space Launch System Mobile Launcher Modal Pretest AnalysisNASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Artemis 1, programmatically referred to as the integrated vehicle modal test. The integrated vehicle modal test of the Artemis 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the Mobile Launcher while inside the Vehicle Assembly Building, which is currently scheduled for the summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Artemis 1 integrated vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and Space Launch System during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this independent Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of successfully completing the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis for its three test configurations and the unique challenges faced due to the Mobile Launcher’s size and weight, which are typically not faced when modal testing aerospace structures.
Document ID
20200000863
Acquisition Source
Glenn Research Center
Document Type
Presentation
Authors
Akers, James C.
(NASA Glenn Research Center Cleveland, OH, United States)
Sills, Joel W., Jr.
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
February 13, 2020
Publication Date
February 10, 2020
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
GRC-E-DAA-TN77647
Meeting Information
Meeting: International Modal Analysis Conference (IMAC)
Location: Houston, TX
Country: United States
Start Date: February 10, 2020
End Date: February 13, 2020
Sponsors: Society for Experimental Mechanics, Inc.
Funding Number(s)
WBS: 869021.05.03.09.96
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available