Standard Operating Procedure (SOP) for Preparation of an Operation & Configuration Control Plan (OCCP) of "Category B" Pressure Vessels/SystemsThis Standard Operating Procedure (SOP) describes the requirements and methodology for preparation of an Operation & Configuration Control Plan (OCCP) as required by JPR 1710.13 to assure safe ground pressurization and pressurization during aircraft operations of “Category B” Pressure Vessels/Systems (PV/S) at Johnson Space Center (JSC), Ellington Field (EFD) and associated NASA spaceflight/aircraft operations facilities.

An OCCP is a written assessment showing that a “Category B” PV/S is safe for ground pressurization and pressurization during aircraft operations, within the bounds established by the OCCP.
Document ID
20200003143
Acquisition Source
Johnson Space Center
Document Type
Other - Standard Operating Procedure Document
External Source(s)
Authors
Nathanael J Greene
(Johnson Space Center Houston, Texas, United States)
Mohammad Shoeb
(Jacobs (United States) Dallas, Texas, United States)
Date Acquired
May 4, 2020
Publication Date
December 6, 2017
Subject Category
Ground Support Systems And Facilities (Space)
Report/Patent Number
JSC-E-DAA-TN57107
SOP-009.98A
Report Number: JSC-E-DAA-TN57107
Funding Number(s)
CONTRACT_GRANT: NNJ13HA01C
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available