NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
ATD-2 Integrated Arrival/Departure/Surface (IADS) Phase 3 System RequirementsThis document contains the system requirements for the IADS data elements and functional capabilities developed during ATD-2 Phase 3.
Document ID
20205005900
Acquisition Source
Ames Research Center
Document Type
Other - System Requirements Document
Authors
Tyler T Ngo
(Universities Space Research Association Columbia, Maryland, United States)
Stuart Wilson
(Mosaic ATM (United States) Leesburg, Virginia, United States)
Andrew T Ging
(Ames Research Center Mountain View, California, United States)
Ehsan Talebi
(Millennium Engineering and Integration (United States) Arlington, Virginia, United States)
Louise K Morgan Ruszkowski
(Wyle (United States) El Segundo, California, United States)
Date Acquired
August 4, 2020
Publication Date
July 1, 2020
Subject Category
Air Transportation And Safety
Funding Number(s)
CONTRACT_GRANT: NNA14AB82C
CONTRACT_GRANT: NNA13AC87C
CONTRACT_GRANT: NNA16BD14C
PROJECT: 330693
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
NASA Technical Management
Keywords
ATD-2, IADS, Phase 3 System Requirements
No Preview Available