NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
NASA Space Launch System Prepares for Key Hotfire Test Before Vehicle IntegrationNASA this year is working toward the final major integrated hardware and avionics test for its Space Launch System (SLS), the agency’s new super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars and beyond. As the backbone of the Artemis human lunar exploration program, Artemis I SLS operations will then shift to the launch site and integration for the inaugural mission. For this final major test of the first vehicle NASA has built exclusively for deep space exploration since the Saturn V, a NASA/Boeing/Aerojet Rocketdyne team will conduct the final core stage “green run” test at NASA's Stennis Space Center with a dramatic firing of all four core stage engines. This test will validate the operation of the stage structures, main propulsion system, engines, avionics, and software. Following data review, stage inspection, and refurbishment, the stage will be barged to NASA’s Kennedy Space Center to continue integration of the Artemis I launch vehicle. Already underway is assembly of the mission’s five-segment solid rocket boosters. The mission’s upper stage and spacecraft adapters also are staged at the launch site ready for integration. Even as the Artemis I SLS proceeds toward launch later this year, the Artemis II and Artemis III vehicles are coming together, with core stages, engines, boosters, upper stage, and payload accommodations in various stages of manufacturing and/or processing. Planning is also underway for additional core stages and a new, more powerful upper stage that will increase lunar payload mass. SLS is the anchor transportation leg of a plan for sustained human exploration of the Moon, including the first human landing later in the decade. This paper will discuss SLS progress to date and expected 2021 milestones.
Document ID
20210000420
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Bruce R. Askins
(Marshall Space Flight Center Redstone Arsenal, Alabama, United States)
Date Acquired
January 13, 2021
Subject Category
Launch Vehicles And Launch Operations
Meeting Information
Meeting: 68th JANNAF Propulsion Meeting
Location: Virtual
Country: US
Start Date: June 7, 2021
End Date: June 17, 2021
Sponsors: Joint Army-Navy-NASA-Air Force (JANNAF)
Funding Number(s)
CONTRACT_GRANT: 80MSFC21D0011
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available