NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Summer launch options for the Genesis missionIn November 2000, the decision was finalized to delay launch to the Genesis mission from February 2001 until sometime in the following summer. Given the nature of libration point trajectories and the unique characteristics of the Genesis mission, a complete redesign of the trajectory is required. The design procedure along with the application to the Genesis redesign is discussed and the new baseline solution is presented.
Document ID
20210002213
Acquisition Source
Jet Propulsion Laboratory
Document Type
Other
External Source(s)
Authors
Marchand, B. G.
Howell, K. C.
Wilson, R. S.
Barden, B. T.
Date Acquired
July 30, 2001
Publication Date
July 30, 2001
Publication Information
Publisher: UNKNOWN
Distribution Limits
Public
Copyright
Other
Technical Review
Keywords
Genesis
mission
design
libration
point

Available Downloads

There are no available downloads for this record.
No Preview Available