NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt AssembliesAn Engineering-of-Failure approach to designing and executing an accelerated product qualification test was performed to support a risk assessment of a work-around necessitated by an on-orbit failure of another piece of hardware on the Mars Global Surveyor spacecraft.
Document ID
20210003243
Acquisition Source
Jet Propulsion Laboratory
Document Type
Other
External Source(s)
Authors
Larson, T.
Gibbel, M.
Date Acquired
June 13, 1999
Publication Date
June 13, 1999
Publication Information
Publisher: UNKNOWN
Distribution Limits
Public
Copyright
Other
Technical Review
Keywords
accelerated
stress
testing
wirebond
failures

Available Downloads

There are no available downloads for this record.
No Preview Available