Requirements Development and Management on the Psyche ProjectIn January 2017, Psyche was one of two mission concepts selected by NASA for flight as part of the 14th Discovery mission competition. The project has been staffing up and maturing the spacecraft, instrument and mission system baseline designs on the path towards a 2022 launch. During much of 2018, the Project has been executing the lifecycle stage called Phase B, “Preliminary Design and Technology Completion,” one key element of which is the development and management of requirements at various levels. In the case of the Psyche project, this process has been particularly unique for several reasons. The project utilizes a Solar Electric Propulsion (SEP) Chassis from Space Systems Loral (SSL), a high volume manufacturer of commercial geostationary (GEO) telecom spacecraft based on the 1300 satellite bus. While SSL has an extensive, well-vetted set of requirements based on their very successful Earth-orbiting product line, translating that heritage to a deep space science mission required special care. In addition to the differences associated with the deep space environment and longer communication times, new interfaces had to be incorporated. While a substantial portion of the Flight System consists of the SEP Chassis, there were several new interfaces within various subsystems between SSL components and those provided by JPL and other contractors. Managing these interfaces through requirements at a relatively higher level than normally seen on internal or external builds proved challenging. Finally, the Psyche spacecraft plans to host the flight terminal of the Deep Space Optical Communications (DSOC) technology demonstration, which is itself a separate project with its own requirements that must be flowed down and managed. This paper will present an overview of the requirement development and management process for the Psyche project. It will discuss in detail the various challenges summarized above, the methods and decisions chosen to address them, and evaluate their overall effectiveness at this stage in the project.
Document ID
20210005950
Acquisition Source
Jet Propulsion Laboratory
Document Type
Preprint (Draft being sent to journal)
External Source(s)
Authors
Elkins-Tanton, Linda T.
Lord, Peter
Williams, Ashley
Warner, Noah
Snyder, Steve
Solish, Benjamin
Oh, David Y.
Lum, Karen
Drain, Tracy
Boland, Stacey
Hart, William
Date Acquired
March 2, 2019
Publication Date
March 2, 2019
Publication Information
Publisher: Pasadena, CA: Jet Propulsion Laboratory, National Aeronautics and Space Administration, 2019
Distribution Limits
Public
Copyright
Other
Technical Review

Available Downloads

There are no available downloads for this record.