NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Mars 2020 Sampling and Caching Subsystem Environmental Development Testing and Preliminary ResultsThe Environmental Development Testing program
supported the development test efforts of the Mars 2020
Sampling and Caching Subsystem from May to November 2015.
The engineering prototype Brassboard Corer was attached to a
five degree-of-freedom robotic arm to execute a 96-test matrix
of ambient and low pressure tests in the 10 ft. thermal vacuum
chamber at the NASA Jet Propulsion Laboratory, California
Institute of Technology. The Pretest, Test, and Post Test
procedures are described, and some preliminary results are
discussed. Data and observations from this test campaign
inform the future development of the software and hardware
toward the Mars 2020 flight design, including the next iteration
of the rock coring drill, the Engineering Development Unit
Corer.
Document ID
20210007767
Acquisition Source
Jet Propulsion Laboratory
Document Type
Preprint (Draft being sent to journal)
External Source(s)
Authors
Kriechbaum, Kristo
Brown, Kyle M.
Chu, Lauren E.
Date Acquired
March 4, 2017
Publication Date
March 4, 2017
Publication Information
Publisher: Pasadena, CA: Jet Propulsion Laboratory, National Aeronautics and Space Administration, 2017
Distribution Limits
Public
Copyright
Other
Technical Review

Available Downloads

There are no available downloads for this record.
No Preview Available