Lessons Learned in Extended-Extended Spitzer Space Telescope OperationsThe Spitzer Space Telescope is executing the ninth year of extended operations beyond its 5.5-year prime mission. The project anticipated a maximum extended mission of about four years when the first mission extension was proposed. The robustness of the observatory hardware and the creativity of the project engineers and scientists in overcoming hurdles to operations has enabled a substantially longer mission lifetime. This has led to more challenges with an aging groundsystem due to resource reductions and decisions made early in the extended mission based on a shorter planned lifetime. We provide an overview of the extended mission phases, challenges met in maintaining and enhancing the science productivity, and what we would have done differently if the extended mission was planned from the start to be nearly twice as long as the prime mission.
Document ID
20210008776
Acquisition Source
Jet Propulsion Laboratory
Document Type
Preprint (Draft being sent to journal)
External Source(s)
Authors
Lowrance, Patrick
Mahoney, William A.
Scire, Elena
Silbermann, Nancy
Bennett, Carson Lee
Carey, Sean
Hunt, Joseph C.
Kahr, Bolinda E.
Storrie-Lombardi, Lisa J.
Date Acquired
June 12, 2018
Publication Date
June 12, 2018
Publication Information
Publisher: Pasadena, CA: Jet Propulsion Laboratory, National Aeronautics and Space Administration, 2018
Distribution Limits
Public
Copyright
Other
Technical Review

Available Downloads

There are no available downloads for this record.
No Preview Available