Scroll Pump Dust Tolerance Test for Martian Atmospheric AcquisitionThe ability to generate oxygen on the Martian surface will be essential to establishing a human presence on Mars. Flow generating devices such as pumps, compressors, and blowers will be crucial components in Martian atmospheric acquisition and processing systems that need to work reliably during the mission duration. A concern with the reliability of the system is its ability to continue to perform nominally when Martian dust, if it bypasses the inlet filter, enters into the system. A series of tests were conducted to simulate the ingestion of Martian dust on a small scroll pump, similar to the one used on the MOXIE payload. The inlet of the pump was connected to a large volume closed-loop pipe system, known as the Mars Atmospheric Flow Loop, containing pure CO2 gas at a Martian pressure of 7 Torr. A length of stainless steel tubing was extended from the inlet port of scroll pump, which was mounted outside the flow loop, to the inside volume of the flow loop using a feed-through compression fitting. A steady low-speed flow was generated inside the flow loop to continuously disperse and transport the dust toward the inlet tubing. JSC-Mars 1 Martian simulant was used to challenge the pump. Pump performance parameters such as flow rate, pump speed, pressure and temperature were monitored during these tests. Samples of the dust entering the pump inlet were taken prior to the exposure tests, using an inline filter element to determine the rate of dust ingestion into the internal components of the pump. After two tests with exposure times of one hour, the data indicated that small changes in pump performance took place under high rates of dust exposure.
Document ID
20210011639
Acquisition Source
Glenn Research Center
Document Type
Presentation
Authors
Juan H Agui
(Glenn Research Center Cleveland, Ohio, United States)
Justin P Elchert
(Glenn Research Center Cleveland, Ohio, United States)
Date Acquired
March 19, 2021
Subject Category
Lunar And Planetary Science And Exploration
Meeting Information
Meeting: ASCE Earth and Space Conference
Location: Virtual
Country: US
Start Date: April 19, 2021
End Date: April 23, 2021
Sponsors: American Society of Civil Engineers
Funding Number(s)
WBS: 596118.04.34.22
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
Technical Review
Single Expert
Keywords
Martian Atmospheric
No Preview Available