Visualization of Upcoming ISS Changes - Featuring MLM InstallThe MAGIK Robotic analysis team provides kinematic feasibility assessments and robotic visualizations for the ISS. The latest visualization displays ISS planned operations in increments 65 and 66 as of the 7/6/21 flight plan. Featured events include the arrival of the Multipurpose Laboratory Module (MLM) and surrounding visiting vehicle actions.

The complete list of actions shown include: Repeated ISS attitude adjustment maneuvers from: starting position with positive X Velocity Vector (+XVV), yaw to -XVV, and pitch to final position with -ZVV. Then subsequent return to -XVV and nominal position +XVV.
Crew-2 relocation from Node 2 Forward (N2F) to Node 2 Zenith (N2Z).
77 Progress with Docking Compartment 1 (DC1) undock and departure.
MLM install.
Boe-OFT2 arrival and departure at N2F.
NG-16 arrival and berth at Node 1 Nadir (N1N).
SpX-23 arrival at N2F.
64 Soyuz relocation and fly-around.
SpX-23 departure from N2F.
65 Soyuz approach and dock to MRM-1.
64 Soyuz undock and departure.
78 Progress relocation.
Document ID
20210016465
Acquisition Source
Johnson Space Center
Document Type
Video
Authors
Alexander Radford Fryer
(BARRIOS TECHNOLOGY LTD)
Traci Lee Charles
(Barrios Technology LTD)
Date Acquired
May 27, 2021
Publication Date
July 20, 2021
Publication Information
Subject Category
Cybernetics, Artificial Intelligence And Robotics
Funding Number(s)
CONTRACT_GRANT: 80JSC020C0017
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Single Expert
Keywords
ISS
visualization
animation
MLM