NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Soil Interim Measures Work Plan Q6 Radar Station, Q6-0082, Solid Waste Management Unit #112, Location of Concern 3 Kennedy Space Center, FloridaThis work plan serves as the design to remove soil with concentrations of copper and barium above Florida Department of Environmental Protection Residential Soil Cleanup Target Levels in the vicinity where radar station refurbishment activities were conducted.
Document ID
20210022292
Acquisition Source
Kennedy Space Center
Document Type
Contractor or Grantee Report
Authors
Steven Cobert
(Aecom (United States) Los Angeles, California, United States)
Date Acquired
October 3, 2021
Publication Date
August 13, 2021
Subject Category
Environment Pollution
Funding Number(s)
CONTRACT_GRANT: 80KSC019D0010
TASK: 80KSC020F0027
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Professional Review
No Preview Available