NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
NASA Ames Research Center Unitary Plan Wind Tunnel Fall 2018 Outage - Motor 1 Activity: Stator ShiftThe Unitary Plan Wind Tunnel consists of the 11 x 11- Foot Transonic Wind Tunnel and the 9 x 7 foot Supersonic Wind Tunnel. The four 65,000hp electric motors that drive the wind tunnel compressors require periodic maintenance. In order to inspect the motors without the removal of drive shaft components, the stator must be shifted away from the motor. This process is referred to as "Stator Shift".

Video is mp4 formatted with runtime of 2 mins 54 secs.
Document ID
20210025589
Acquisition Source
Ames Research Center
Document Type
Video
Authors
Kimberly Sue Aldenbrook
(Jacobs (United States) Dallas, Texas, United States)
Date Acquired
December 7, 2021
Publication Date
December 7, 2021
Subject Category
Aeronautics (General)
Engineering (General)
Funding Number(s)
CONTRACT_GRANT: NNA16BD26C
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
NASA Technical Management
Keywords
Wind Tunnel
Compressor
Electric Motor
Stator Shift
No Preview Available