NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Components Refurbishment and Chemical Analysis Facility Hot Spot 1 Year 2 Annual Performance Monitoring ReportThe Performance Monitoring Report presents the Year 2 operations, maintenance, and monitoring (OM&M) activities for the hydraulic containment system (HCS) Interim Measures (IM) at the Components Refurbishment and Chemical Analysis (CRCA) Facility located at John F. Kennedy Space Center (KSC), Florida. Year 2 operations extended from September 2020 to August 2021 and included: operation, maintenance and monitoring of the HCS; performance monitoring through collection of groundwater samples; and sub-slab gas and ambient air sampling. The existing hydrogeologic model was also updated. The system is performing as designed, and groundwater data demonstrate contaminant reduction.
Document ID
20220000284
Acquisition Source
Kennedy Space Center
Document Type
Contractor or Grantee Report
Authors
K Alex Murphy
(Tetra Tech, Inc.)
Date Acquired
January 20, 2022
Publication Date
January 1, 2022
Subject Category
Environment Pollution
Funding Number(s)
CONTRACT_GRANT: 80KSC019F0066
Distribution Limits
Public
Copyright
Portions of document may include copyright protected material.
Technical Review
NASA Technical Management
Keywords
CRCA
Components Refurbishment and Chemical Analysis
hydraulic containment
hydraulic control
interim measure
IM
pump and treat
groundwater model
air sampling
sub-slab gas
remediation
groundwater
vinyl chloride
No Preview Available