NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Using Flexible Execution, Replanning, and Model Parameter Updates to Address Environmental Uncertainty for a Planetary LanderPlanning in an unknown environment presents a number of challenges: incorrect world models, unpredictable variation in execution, and fixed depletable resources. Productivity in the face of these challenges requires an integrated approach to planning and execution that is capable of accomplishing goals, reacting to variation, and maximizing overall utility. We examine this problem in the context of a Europa Lander concept mission. We model the problem as a hierarchical task network, framing it as a utility maximization problem with a depletable energy resource. Then, we propose a planning and execution framework that responds to feedback using three techniques: flexible execution, periodic replanning, and online parameter estimation and re-goaling. We demonstrate the efficacy of each of these techniques through simulation of a Europa Lander mission, showing higher utility achievement compared to simpler approaches, when presented with variation in energy consumption. We demonstrate that an approach to scheduling and execution that is grounded in decision theory and integrated planning and execution will be an enabling technology for future tightly-constrained planetary surface missions.
Document ID
20220001493
Acquisition Source
Jet Propulsion Laboratory
Document Type
Preprint (Draft being sent to journal)
External Source(s)
Authors
Chien, Steve
Basich, Connor
Russino, Joseph A.
Wang, Daniel
Date Acquired
October 26, 2020
Publication Date
October 26, 2020
Publication Information
Publisher: Pasadena, CA: Jet Propulsion Laboratory, National Aeronautics and Space Administration, 2020
Distribution Limits
Public
Copyright
Other
Technical Review

Available Downloads

There are no available downloads for this record.
No Preview Available