NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway ProgramNASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.
Document ID
20220008636
Acquisition Source
Glenn Research Center
Document Type
Conference Paper
Authors
Daniel A Herman
(Glenn Research Center Cleveland, Ohio, United States)
Timothy Gray
(Glenn Research Center Cleveland, Ohio, United States)
Ian Johnson
(Maxar Technologies (United States) Westminster, Colorado, United States)
Sarah Hussein
(Maxar Technologies (United States) Westminster, Colorado, United States)
Taylor Winkelmann
(Maxar Technologies (United States) Westminster, Colorado, United States)
Date Acquired
May 31, 2022
Subject Category
Spacecraft Propulsion And Power
Meeting Information
Meeting: 37th International Electric Propulsion Conference
Location: Boston, MA
Country: US
Start Date: June 19, 2022
End Date: June 23, 2022
Sponsors: Electric Rocket Propulsion Society
Funding Number(s)
WBS: 837933.06.03.02.03
CONTRACT_GRANT: 80GRC019D0012
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Single Expert
Keywords
Electric Propulsion
Hall thrusters
Gateway
No Preview Available