2021 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, FloridaThis report presents a summary of the Corrective Measures Implementation (CMI) and Interim
Measure (IM) implementation activities that occurred from January 2021 through December
2021 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building
(VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy
Space Center, Florida.

The following summaries briefly describe areas within SWMU 056 identified by historical site
investigation activities where groundwater monitoring and remedial actions have been
implemented to date.
Document ID
20220009366
Acquisition Source
Kennedy Space Center
Document Type
Contractor or Grantee Report
Authors
Randall K. Sillan
(Aecom (United States) Los Angeles, California, United States)
Date Acquired
June 15, 2022
Publication Date
June 1, 2022
Subject Category
Ground Support Systems And Facilities (Space)
Funding Number(s)
CONTRACT_GRANT: 80KSC019D0010
TASK: 80KSC019F0075
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Single Expert
No Preview Available