NASA Logo

NTRS

NTRS - NASA Technical Reports Server

The auto‑search feature has been disabled based on user feedback. Enter a search term/phrase and click “Search” to begin.

Back to Results
Operating and Maintaining the JWST Cleanroom attached to JSC's Chamber A during preparations for the OTIS Cryogenic Thermal Vacuum Test In order to maintain cleanliness during preparations for JWST’s OTIS (Optical Telescope Element-Integrated Science Instrument Module) Cryogenic Thermal Vacuum Test, a cleanroom was built that attached directly to the 60-year-old Chamber A. The cleanroom and chamber were outfitted with independent environmental control systems each providing ISO Class 71 air cleanliness. To maintain balanced, positive pressure in both the cleanroom and chamber volumes, a special control protocol was developed and successfully implemented. Dual back-up environmental control units (one each for the chamber and cleanroom) were installed just outside the building to provide environmental control redundancy due to a single source chilled water supply and weather threats. In addition, lack of a dedicated cleanroom airlock facilitating clean ingress and egress made it necessary to perform additional cleaning and packaging, as well as augment the uncontrolled truck lock space with small clean tents for pre-cleaning. Special procedures were developed to allow ingress of extra-large support equipment required for load testing of the cleanroom crane, installation of optical equipment in Chamber A and accommodation of the OTIS shipping container. A thorough bake-out and cleaning of Chamber A was also necessary to reduce volatiles from the shroud’s black thermal paint and to reduce particle fallout. Acrylic adhesive fracture discovered during early cryo-testing represented a significant challenge that was successfully mitigated prior to OTIS testing. A dedicated team of Contamination Control (CC) Technicians was specifically trained to clean support equipment and screen materials entering the cleanroom and chamber to ensure cleanliness and vacuum compatibility.
Document ID
20220011977
Acquisition Source
Goddard Space Flight Center
Document Type
Presentation
Authors
Kelly Henderson-Nelson
(KBR (United States) Houston, Texas, United States)
Edwin Goldman
(Prime Science and Technology Inc. 123 Parkin St., Baltimore, MD 21201)
Joe Ward
(KBR (United States) Houston, Texas, United States)
Jason Durner
(KBR (United States) Houston, Texas, United States)
Jason Brandon
(KBR (United States) Houston, Texas, United States)
Zao Huang
(Science Systems and Applications (United States) Lanham, Maryland, United States)
Jonathan Homan
(Johnson Space Center Houston, Texas, United States)
Date Acquired
August 4, 2022
Subject Category
Engineering (General)
Optics
Meeting Information
Meeting: SPIE Optics and Photonics 2022
Location: San Diego, CA
Country: US
Start Date: August 21, 2022
End Date: August 25, 2022
Sponsors: SPIE
Funding Number(s)
PROJECT: 411672.02.03
CONTRACT_GRANT: NNG15CR64C
CONTRACT_GRANT: 80GSFC19C0060
Distribution Limits
Public
Copyright
Portions of document may include copyright protected material.
Technical Review
Single Expert
Keywords
James Webb Space Telescope
Cleanroom
Environmental
Chamber
JSC
No Preview Available