NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
A Decision Support System for Extravehicular Operations Under Significant Communication LatencyWithin the next few decades, humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant two-way communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) performing an EVA and an Earth-based mission control.

Next-generation operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the on-planet extravehicular crewmember(s), and intermediate mission support from intravehicular crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth.

For this purpose, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automating the tracking and projection of consumables usage over an EVA timeline, providing real-time probabilistic safety assessments of an EVA timeline given consumables constraints, and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits.

The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the intravehicular crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g. training bias.
Document ID
20220017528
Acquisition Source
Johnson Space Center
Document Type
Conference Paper
Authors
Timothy McGrath
(JES Tech (United States) Houston, Texas, United States)
Jason Norcross
(Wyle (United States) El Segundo, California, United States)
Brianna Sparks
(Johnson Space Center Houston, Texas, United States)
Fernando Figueroa
(Stennis Space Center Bay Saint Louis, Mississippi, United States)
Jon Morris
(D2K TECHNOLOGIES)
Federico Piatti
(D2K TECHNOLOGIES)
Jeffrey T Somers
(Johnson Space Center Houston, Texas, United States)
Date Acquired
November 21, 2022
Subject Category
Statistics and Probability
Man/System Technology and Life Support
Systems Analysis and Operations Research
Meeting Information
Meeting: 52nd International Conference on Environmental Systems 2023
Location: Calgary
Country: CA
Start Date: July 16, 2023
End Date: July 20, 2023
Sponsors: International Conference on Environmental Systems (ICES)
Funding Number(s)
CONTRACT_GRANT: 10449.2.03.02.34.2043
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
NASA Technical Management
Keywords
Mars
EVA
decision support
operations
mission control
No Preview Available