Space Shuttle Orbiter Fracture Control PlanThe criteria are presented for preventing space shuttle structural failure associated with crack initiation or propagation during fabrication, test, handling, and the operational life of the vehicle. The criteria discussed include: engineering responsibilities, assurance management, production, operation and test, procurement, critical parts selection, design, and structural analysis.
Document ID
20220017997
Document Type
Contractor Report (CR)
Authors
JR King (Rockwell International Downey, California, United States)
P. Julian (Rockwell International Downey, California, United States)
K. R. Johnson (Rockwell International Downey, California, United States)