Navigation Performance of the BioSentinel Deep Space CubeSat MissionThe BioSentinel mission was recently launched aboard the SLS launch vehicle (LV) as part of the Artemis-
1 campaign. The BioSentinel navigation team successfully tracked and guided the spacecraft through a
lunar gravity assist to its destination Earth-trailing heliocentric orbit. This 6U CubeSat carries live yeast
cells to analyze the effects of radiation at large distances from Earth, becoming the first biological
payload in Deep Space. Prelaunch activities included mission design updates, orbit determination
rehearsals and the development of a tracking schedule in coordination with the Artemis-1 payload office
and the Deep Space Network (DSN). An important influence on the trajectories of Artemis I secondaries
was the uncertainty associated with deployment from the Interim Cryogenic Propulsion System (ICPS),
the upper stage of the SLS LV. The ICPS was rotating at a rate of 1 rpm; there was also an uncertainty in
the spin axis attitude, which translated into an unknown clock angle of deployment. The variability in
this angle and magnitude of deployment implied the existence of a non-negligible risk of a lunar impact,
which was evaluated for various potential launch dates. We present the results of Monte Carlo analyses
and compute the pertinent maneuvers to avoid it. In addition, we present a comparison with the actual
deployment once the mission launched by reconstructing our trajectory with tracking data.

On November 16th 2022 BioSentinel successfully deployed from ICPS and the navigation team started to
receive 2-way Doppler and Sequential Ranging data from the DSN. We processed early data to try to
obtain a first ephemeris using Initial Orbit Determination (IOD) methods such as the least squares. Soon
after deployment, the spacecraft was tumbling and entered safe mode, creating a period where the
tracking data were sparse. The mission team recovered the spacecraft and after four tracking passes, we
solved for a first ephemeris that was sent to the DSN for better tracking of the spacecraft. After
propagating this first ephemeris solution, we determined that we avoided impact with a margin of a few
hundred km from the lunar surface. More tracking data over the next few days (from DSN as well as ESA
antennas) allowed for a more refined orbit solution predicting a periselene altitude of 406 km and a
lunar eclipse lasting 36.5 minutes. Therefore, BioSentinel operators aborted any correction maneuvers.
This periselene altitude also gave us the necessary energy to achieve a heliocentric orbit. The next
challenge was due to the necessary adjustments in our orbit determination method due to the large
energy boost resulting from the lunar flyby. After a series of tracking passes we were able to get a
nominal solution that resulted into a stable trajectory.

This paper discusses in detail the navigation performance using the X-band IRIS transponder, as well as
the challenges and lessons learned prior to and during this deep space, CubeSat mission.
Document ID
20230001414
Acquisition Source
Ames Research Center
Document Type
Conference Paper
Authors
Andres Dono Perez
(Millennium Engineering and Integration (United States) Arlington, Virginia, United States)
Jose Luis Alberto Alvarellos
(Millennium Engineering and Integration (United States) Arlington, Virginia, United States)
Date Acquired
January 27, 2023
Subject Category
Astrodynamics
Meeting Information
Meeting: 37th Annual Small Satellite (SmallSat) Conference
Location: Logan, UT
Country: US
Start Date: August 5, 2023
End Date: August 10, 2023
Sponsors: Utah State University
Funding Number(s)
PROJECT: 822174.05.01.01
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
NASA Peer Committee