NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Risk-Based SMA and Modernizing Risk Classification at GSFCIn 2014, in response to a large volume of feedback from industry, the science community, and internal to Goddard Space Flight Center (GSFC), GSFC’s Safety and Mission Assurance (SMA) Directorate began a transition to a risk-based implementation of SMA, departing from its longstanding practice of being primarily driven by a mostly static set of Mission Assurance Requirements. The transition started out with a pilot project involving risk-based acceptance of bare-printed circuit boards that was enormously successful, continued through a complete organizational transformation in 2015, and culminated with the baselining of formal Risk-Based SMA policy in 2016. In this presentation we will describe the risk-based SMA concept, segue into how it shapes a modernization of risk classification that GSFC has rolled out, and provide results from the original pilot project for risk-based SMA, involving the printed circuit board assurance process.
Document ID
20230002949
Acquisition Source
Goddard Space Flight Center
Document Type
Presentation
Authors
Jesse Leitner
(Goddard Space Flight Center Greenbelt, Maryland, United States)
Date Acquired
March 3, 2023
Subject Category
Space Transportation and Safety
Space Sciences (General)
Meeting Information
Meeting: Future In-Space Operations Seminar
Location: Greenbelt, MD
Country: US
Start Date: March 22, 2023
Sponsors: Spirit Astro
Funding Number(s)
WBS: 981698.02.03.51.02.01
Distribution Limits
Public
Copyright
Portions of document may include copyright protected material.
Technical Review
NASA Peer Committee
No Preview Available