NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Multi-Robot Assembly Scheduling for the Lunar Crater Radio Telescope on the Far-Side of the MoonThe Lunar Crater Radio Telescope (LCRT) is a pro- posed ultra-long-wavelength radio telescope to be constructed on the far side of the moon. The proposed telescope will be constructed by deploying a 1km wire mesh in a 3-5km crater using a team of wall-climbing DuAxel robots. In this work, we consider the problem of generating minimum-time assembly sequences for LCRT, using realistic models of travel speed and lighting. Specifically, we pose the assembly sequencing problem as a mixed-integer linear program (MILP), which we solve to global optimality using commercial solvers. We present methods for modeling time-varying travel and assembly times, based on variable lighting conditions (including crater shadowing), and show how such time-varying parameters can be incorporated into the MILP. Finally, we present numerical studies of our method, showing how makespan varies with the number of assembly robots.
Document ID
20230005708
Acquisition Source
Jet Propulsion Laboratory
Document Type
Preprint (Draft being sent to journal)
External Source(s)
Authors
Schwager, Mac
McGarey, Patrick
Goel, Ashish
Bandyopadhyay, Saptarshi
Culbertson, Preston
Date Acquired
March 5, 2022
Publication Date
March 5, 2022
Publication Information
Publisher: Pasadena, CA: Jet Propulsion Laboratory, National Aeronautics and Space Administration, 2022
Distribution Limits
Public
Copyright
Other
Technical Review

Available Downloads

There are no available downloads for this record.
No Preview Available