NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Thermal Protection Design for Uranus Orbiter Flagship Mission: Probes and AerocaptureIntroduction: The Decadal Strategy for Plane-tary Science and Astrobiology prioritized a Uranus Orbiter and Probe (UOP) as the highest-priority new Flagship mission for the 2023 – 2032 decade. Missions to the outer solar system require significant interplanetary cruise durations on the order of 12 – 15 years while carrying propellant to reduce velocity by several km/s to achieve a desired orbit. Parasitic mass and travel time can be traded where faster arrival velocities require more mass expensive capture burns. Recent advancements in Thermal Protection Systems (TPS) for planetary entry enable mass-efficient designs for atmospheric probes and missions that apply aerocapture for orbit insertion.
Document ID
20230006671
Acquisition Source
Ames Research Center
Document Type
Presentation
Authors
Joseph D Williams
(Analytical Mechanics Associates (United States) Hampton, Virginia, United States)
Jonathan Morgan
(AEGIS)
Soumyo Dutta
(Langley Research Center Hampton, Virginia, United States)
J B Scoggins
(Langley Research Center Hampton, Virginia, United States)
Rohan Deshmukh
(Purdue University West Lafayette West Lafayette, Indiana, United States)
Eli Shellabarger
(Langley Research Center Hampton, Virginia, United States)
Rafael A Lugo
(Langley Research Center Hampton, Virginia, United States)
Ben Tackett
(Analytical Mechanics Associates (United States) Hampton, Virginia, United States)
Breanna Johnson
(Johnson Space Center Houston, Texas, United States)
Dan Matz
(Johnson Space Center Houston, Texas, United States)
Josh Geiser
(Johnson Space Center Houston, Texas, United States)
Declan Mages
(Jet Propulsion Lab La Cañada Flintridge, California, United States)
Ricardo Restrepo
(Jet Propulsion Lab La Cañada Flintridge, California, United States)
Date Acquired
May 1, 2023
Subject Category
Fluid Mechanics and Thermodynamics
Astrodynamics
Meeting Information
Meeting: Uranus Flagship Workshop
Location: Pasadena, CA
Country: US
Start Date: July 25, 2023
End Date: July 27, 2023
Sponsors: Lunar and Planetary Institute
Funding Number(s)
PROJECT: ECI Aerocapture
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
NASA Technical Management
Keywords
Uranus TPS Aerocapture Probe
No Preview Available