NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Request for Discontinuation of Long-Term Monitoring Orsino Storage Yard Solid Waste Management Unit 004 Kennedy Space Center, FloridaThis report presents the site history, groundwater sampling results, and recommendations from the 2021 Industrial Area (IA) LTM activities at ORSY. ORSY has been used as a staging facility for electrical equipment since 1966 (EG&G 1991). Initial investigations conducted between 1986 and 1992 focused on polychlorinated biphenyls (PCBs) in soil. A series of soil excavation interim measures (IMs) were conducted to remove soils containing total PCB concentrations of greater than 25 milligrams per kilogram (mg/kg). A Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) was completed in several phases at ORSY from 1998 through 2005, with PCBs in soil and volatile organic compounds (VOCs) in groundwater identified as contaminants of concern.
Document ID
20230008686
Acquisition Source
Kennedy Space Center
Document Type
Contractor or Grantee Report
Authors
Jennifer Lynn Joyal
(Aecom (United States) Los Angeles, California, United States)
Date Acquired
June 6, 2023
Publication Date
June 1, 2023
Subject Category
Ground Support Systems and Facilities (Space)
Funding Number(s)
CONTRACT_GRANT: 80KSC019D0010
TASK: 80KSC019F0071
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Single Expert
No Preview Available