Artemis Missions Probabilistic Risk Assessment (PRA) & Reliability Assessment Overview
To show how NASA’s Moon-to-Mars (M2M) program can use hardware reliability assessments and comprehensive Probabilistic Risk Assessments (PRAs) to estimate risk of future missions and manage risk via safety and mission success requirements from the top down, so that this risk can be balanced with other program metrics like cost and schedule. These PRAs and reliability assessments can be used during the concept, design, and operational phases of development. This presentation also provides some thoughts on how the NASA process can be utilized for a lunar surface power grid development.
Document ID
20230010735
Acquisition Source
Johnson Space Center
Document Type
Presentation
Authors
Roger Boyer
(Johnson Space Center Houston, Texas, United States)
Date Acquired
July 24, 2023
Subject Category
Statistics And Probability
Meeting Information
Meeting: LSIC Power System Reliability Workshop
Location: Virtual
Country: US
Start Date: July 26, 2023
End Date: July 26, 2023
Sponsors: Johns Hopkins University Applied Physics Laboratory
Funding Number(s)
WBS: 380742.26.01.72
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
Technical Review
Single Expert
Keywords
PRA
NASA
Reliability Analysis
Safety & Mission Success
No Preview Available