NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Aerocapture Trajectory Design for Uranus OrbiterIntroduction: The recently released National Academies Planetary Science and Astrobiology Decadal Survey 2023-2032 [1] identified the Ice Giants as the top priority science destination. While the survey acknowledged the potential for either a Uranus Orbiter and Probe (UOP) mission or a Neptune-Triton Odyssey mission, it ultimately identified the former as the highest priority new flagship mission. UOP missions calls for a launch window of opportunity between 2031-2038 with 12-15 year interplanetary cruise time along with a fully-propulsive Uranus Orbit Insertion burn on the order of a few km/s. However, a mission to Uranus with the same science payload could utilize aerocapture for orbit insertion to achieve both a significant reduction in the interplanetary cruise time and reduction in propulsive burn costs.

Why Aerocapture: Aerocapture is a promising propellant and time-saving orbital insertion technique for planetary destinations with an atmosphere. Although not flight-proven, previous aerocapture systems studies in the literature have demonstrated both the validity and robustness of the technique at various planetary destinations. With respect to the Ice Giant planets, Neptune has seen more of the analysis in the literature. For science missions at Neptune, aerocapture can enable 1.4 times more delivered mass to orbit than an all-propulsive mission for the same launch vehicle while reducing interplanetary cruise times by more than 3 years [2] Additionally with modern guidance and control, Neptune aerocapture with blunt-body aeroshells is realizable [3][4]. There are limited papers in the literature investigating Uranus aerocapture with those available providing a preliminary feasibility assessment [5]. Consequently, the two-year funded NASA Space Technology Mission Directorate (STMD)-funded project, titled Aerocapture System as an Enabling Technology for Ice Giants Missions, aims to mature the analysis and technology state of Uranus aerocapture.

Trajectory Design: This paper presents the current state of the trajectory design in support of the new aerocapture project. The project design philosophy is inspired from recent Neptune aerocapture studies, which employed modern guidance and control, in the sense that blunt-body aeroshells are analyzed. An assessment of the theoretical flight path angle corridor width is conducted for a range of ballistic coefficients and lift-to-drag ratios for both Space Launch System and Falcon Heavy Launch Vehicle interplanetary trajectory solutions. The results from the corridor width assessment provide an assessment of the aerocapture design-space and qualitative metrics on trajectory design considerations. The Program to Optimize Simulated Trajectories II (POST2) is utilized to run Monte Carlo simulations of Uranus aerocapture three-degree-of-freedom bank angle modulated trajectories using a closed-loop numerical-predictor corrector guidance algorithm. UranusGRAM 2021 is utilized as the atmospheric model [6]. A Uranus-developed aerodatabase, originally derived from Mars Science Laboratory (MSL), is utilized to provide vehicle aerodynamics over a wide range of hypersonic flow regimes. A MSL-derived 70 deg 4.5m diameter sphere-cone aeroshell that houses the UOP payload mass is assumed. Robustness testing and performance analysis is conducted, including the assessment of entry state errors, atmosphere density variations, and aerodynamic dispersions. Post-aerocapture Delta-V and aerothermal statistics are formulated into propellant mass and TPS requirements. The results presented in the paper will demonstrate the trajectory viability of Uranus aerocapture.

Preliminary Results: Preliminary trajectory design results indicates successful Uranus aerocapture with a blunt-body aeroshell housing the same payload mass as the UOP mission from an Earth-to-Uranus interplanetary trajectory arriving in less than 7 years. From this interplanetary trajectory, aerocapture provides an orbit insertion Delta-V capability of 6.9 km/s requiring less than 300 m/s for post-aerocapture correction burns (15% of wet mass allocated to propellant). To put this into perspective, the UOP study utilized an Earth-to-Uranus trajectory that arrives in 13 years and requires more than 1000 m/s for fully-propulsive orbit insertion (40% of wet mass allocated to propellant). Achieving the same 6.9 km/s Delta-V capability fully-propulsively is mass prohibitive (97% of wet mass allocated to propellant). Nevertheless, aerocapture has the potential to reduce interplanetary transit times to Uranus by half while delivering the same payload mass to orbit in a reduced propellant mass footprint.

Document ID
20230011838
Acquisition Source
Langley Research Center
Document Type
Poster
Authors
Rohan Deshmukh
(Analytical Mechanics Associates (United States) Hampton, Virginia, United States)
Soumyo Dutta
(Langley Research Center Hampton, Virginia, United States)
Rafael Andres Lugo
(Langley Research Center Hampton, Virginia, United States)
Breanna Jermille Johnson
(Johnson Space Center Houston, Texas, United States)
Daniel A Matz
(Johnson Space Center Houston, Texas, United States)
Joshua Kenji Geiser
(Johnson Space Center Houston, Texas, United States)
Declan Moore Mages
(Jet Propulsion Lab La Cañada Flintridge, California, United States)
Ricardo Leon Restrepo Gomez
(Jet Propulsion Lab La Cañada Flintridge, California, United States)
Eli Ray Shellabarger
(Langley Research Center Hampton, Virginia, United States)
James Scoggins
(Langley Research Center Hampton, Virginia, United States)
Jonathan Morgan
(Ames Research Center Mountain View, California, United States)
Joseph Donald Robert Williams
(Analytical Mechanics Associates (United States) Hampton, Virginia, United States)
Date Acquired
August 9, 2023
Subject Category
Lunar and Planetary Science and Exploration
Meeting Information
Meeting: International Planetary Probe Workshop 2023
Location: Marseille
Country: FR
Start Date: August 28, 2023
End Date: September 1, 2023
Sponsors: International Planetary Probe Workshop
Funding Number(s)
WBS: 255421.04.99.23.05.23
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
NASA Peer Committee
No Preview Available