NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Overview of Crew Operations for Transit to MarsCrewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.
Document ID
20230014124
Acquisition Source
Langley Research Center
Document Type
Presentation
Authors
Nicole Piontek
(Langley Research Center Hampton, Virginia, United States)
Clare Luckey
(Johnson Space Center Houston, Texas, United States)
Date Acquired
September 28, 2023
Subject Category
Systems Analysis and Operations Research
Spacecraft Design, Testing and Performance
Meeting Information
Meeting: AIAA ASCEND
Location: Las Vegas, NV
Country: US
Start Date: October 23, 2023
End Date: October 25, 2023
Sponsors: American Institute of Aeronautics and Astronautics
Funding Number(s)
WBS: 452582.11.23
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
Technical Review
NASA Peer Committee
Keywords
Crew Time
Crew Time Allocation
Mars
Mars Transit
Crew Operations
No Preview Available