NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Payload Topology Forum: IVA Payload Placement Process and TimelineThe IVA Payloads team provides two types of assessments for payloads with different timelines depending on the complexity and flight of the payload. This presentation provides insight into the products and services provided by the Topology team and the proper channels for requesting Topology Assessments or Placement Studies.
Document ID
20230014983
Acquisition Source
Johnson Space Center
Document Type
Presentation
Authors
Bryan Griffith
(Johnson Space Center Houston, Texas, United States)
Jesus Suarez
(Barrios Technology Houston, Texas, United States)
John Bussell
(Boeing (United States) Chicago, Illinois, United States)
Date Acquired
October 17, 2023
Publication Date
October 24, 2023
Subject Category
Engineering (General)
Meeting Information
Meeting: Payload Operations Integration Working Group (POIWG) Meeting #53
Location: Huntsville, AL
Country: US
Start Date: October 24, 2023
End Date: October 26, 2023
Sponsors: Marshall Space Flight Center
Funding Number(s)
CONTRACT_GRANT: 80JSC020C0017
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
NASA Technical Management
Keywords
Placement Study
Topology Assessment
IVA
Payloads
PTF
Payload Topology Forum
Topology
No Preview Available