NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Artemis I Liftoff Measurements Issues and CorrectionsThe SLS rocket was instrumented to collect liftoff environment data during Artemis I launch. The instruments were microphones and pressure transducers. Most data were acceptable for analysis, but required corrections for port resonance, mean signal drift, data system delays, and data spikes. The data were all transmitted via telemetry and in this process some of the measurements experienced unexpectedly long gaps in the data stream. A time validated reconstruction algorithm failed when encountering the long gaps and required use of data from a simpler reconstruction process, with manually inserted data delay corrections. This paper discusses the issues and the corrections that were necessary for the launch data to determine the true physics of the acoustics occurring during launch.
Document ID
20230017832
Acquisition Source
Marshall Space Flight Center
Document Type
Presentation
Authors
Tom Nesman
(Jacobs Huntsville, AL)
Date Acquired
December 6, 2023
Subject Category
Acoustics
Meeting Information
Meeting: AIAA SciTech Forum and Exposition
Location: Orlando, FL
Country: US
Start Date: January 8, 2024
End Date: January 12, 2024
Sponsors: American Institute of Aeronautics and Astronautics
Funding Number(s)
TASK: ER42.12.01.SSEI.TW1.01
TASK: ER42.12.01.SSEI.TC1.01
CONTRACT_GRANT: 80MSFC18C0011
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Single Expert
Keywords
environments
acoustics
liftoff
Artemis I
No Preview Available